• Installation of two 4MVA Cogeneration Electrical and Control Systems
  • Installation of 42”-55”-72” BOM Press Electrical and Control Systems
  • Installation of Fully Automatic Tire Manufacturing Machines Electrical Systems
  • Installation of 34,5 kV TEDAŞ Primary Input Cell
  • Design and Installation of Energy Center Complete Alarm and Control System
  • Installation of BB#1 Banbury Extruder – Calender Electrical and Automation System
  • Installation of BB#2 Banbury Extruder – Calender Electrical and Automation System
  • Design and Installation of Finish Area Conveyors
  • Design and Installation of 3,3 Kv Mill Electric Force and Control System
  • Installation of Triplex Extruder, Cooling Line Electrical System
  • Installation of Quadruplex Extruder, Cooling Line Electrical System
  • Manufacturing and Installation of 5” BOM Press Electrical System
  • Installation and Commissioning of Factory Site Temperature Monitoring System
  • Design and Installation of Boiler Room SCADA System
  • MIMIC Diagram of Purification System
  • Providing Communication between Boiler Room and Purification System with Wireless
  • 3,3 Kv Mill Dynamic Braking System
  • Maintenance and Operation of Factory Lighting System